Challenge and Solution
Green Dot contacted Mobile Modular with a concept for a three-phase approach for starting a new high school in Memphis, Tenn. In 2017, nine classrooms were installed for Phase I, and then an additional ten classrooms in 2018 for Phase II at Bluff City High School. With enrollment growing, Mobile Modular installed an additional 16 classrooms in 2019 during Phase III.
The Layout
Phase I and II are connected buildings. While aluminum canopies and walkways connect Phase III for easy and efficient pass-through.
Highlights
- Admin Room,16 Classrooms, Teacher Resource Rooms
- Ceramic tile in restrooms (floor and walls)
- Entries have raised coin rubber flooring
- 11’ wide corridors
- Fully painted drywall/gypsum
- Rigid corner guards
- 8’6” Ceiling height in the classrooms
- Restrooms: Touch-free Kohler/Delta plumbing fixtures
- Occupancy sensors for all rooms for energy efficiency
- Whiteboards and tack boards in classrooms
Why Call Mobile Modular
By utilizing modular construction and leveraging the experience of the Mobile Modular project team, our client was able to maintain their leadership position and continue their mission to be a global frontrunner in their industry.
If you have any questions about modular building specifications, installation, turnaround time, size specifications, damage cover, insurance, contractual obligations, or adherence to building codes, browse through our comprehensive FAQs section or call us at 866-473-2495.
Our expertise, attention to detail, and end-to-end service is the reason why we continually rank high in customer satisfaction. We understand deadlines and work closely with you to deliver the unit you want on time and budget. Get your project started with Mobile Modular today!